fa
 | 
جمعه ۲۱ بهمن ۱۳۹۰
 | 
 


 عضویت در خبرنامه

 


عضویت تکمیلی


 پيوند

mem.ir


به ما لينک دهيد

[RSS 2.0]

مطالب مرتبط:
دسته بندي
IPS
دانلود
+IPS PIC
+IPS-E-PR-280

IPS-E-PR-280-ENGINEERING STANDARD FOR START-UP SEQUENCE AND GENERAL COMMISSIONING PROCEDURES

مسير جاري:
استاندارد ها -> (IPS)

کد:  45
عنوان:  IPS-E-PR-280-ENGINEERING STANDARD FOR START-UP SEQUENCE AND GENERAL COMMISSIONING PROCEDURES
شماره استاندارد:  IPS-E-PR-280
آدرس مستقيم مطلب: به مطلب لينک دهيد
نسخه قابل چاپ: چاپ


This Engineering Standard Specification covers minimum process requirements for plant start-up sequences and general commissioning procedures for Non-Licensed Units or facilities. For Licensed Units, instructions given by the Licenser shall be followed.
Although, the start-up sequences and commissioning procedures differ to some extent from process to process, the basic philosophy and general aspects shall conform to the concepts of this Standard.
However, considering the general commissioning and all activities to be performed prior initial start-up as outlined in this Standard, feed introduction to the Unit shall be according to the stepwise start-up procedure provided by the Contractor in the Unit Operating Manual